New Manufacturing Facility

Location:
This project was a new manufacturing facility for Metalum. Paradise Masonry’s work included;
  • 56,000 sq. ft. interior slab on grade.
  • 3,000 sq. ft. exterior slab on grade.
  • 2,700 sq, ft, slab on deck.
  • 55 bollards.
  • Photo Gallery for New Manufacturing Facility